2013 Winter Projects
Posted: Wed Nov 20, 2013 9:05 pm
So the list is growing: Will be busy on the weekends for sure!
1. Finish installing the AC unit
2. Complete the radar arch and visor
3. New carpet
4. Paint back section of bilge/install raw salt water pump
5. Install new Fishpro Windless
6. New cockpit and bridge canvas
7. Revamp bridge gages and upgrade look
8. Install underwater lighting
9. Replace windshield on Bridge
10. Paint all window trim/door trim black
11. New wall paper in bathroom
12. Remove rear rail and dress gunnel with teak top
13. Sodablast bottom, barrier coat and paint with self polishing ablative paint
14 uncover
15 wax and clean
16 Remove and chrome bilge vents/re-install
17 LAUNCH!!! April 20, 2014 or there abouts
Then I should be close to done!! Time to plan a few trips, maybe Block Island and the CT river.
1. Finish installing the AC unit
2. Complete the radar arch and visor
3. New carpet
4. Paint back section of bilge/install raw salt water pump
5. Install new Fishpro Windless
6. New cockpit and bridge canvas
7. Revamp bridge gages and upgrade look
8. Install underwater lighting
9. Replace windshield on Bridge
10. Paint all window trim/door trim black
11. New wall paper in bathroom
12. Remove rear rail and dress gunnel with teak top
13. Sodablast bottom, barrier coat and paint with self polishing ablative paint
14 uncover
15 wax and clean
16 Remove and chrome bilge vents/re-install
17 LAUNCH!!! April 20, 2014 or there abouts
Then I should be close to done!! Time to plan a few trips, maybe Block Island and the CT river.